null Skip to Content
Your Home, Your Style! Save 10% - Click here for info

Installation Instructions For Flush Mounted Box Beams

  • Wood Beam(s) Wood Beam(s)
  • Wood Blocking 2"x4" or 2"x6" (for mounting) Wood Blocking 2"x4" or 2"x6" (for mounting)
  • Toggle/Lag Bolts Toggle/Lag Bolts
  • Screw Gun / Drill Driver & Bits Screw Gun / Drill Driver & Bits
  • Wood Cutting
Saw with
Finish Blade Wood Cutting Saw with Finish Blade
  • Caulk Gun Caulk Gun
  • Loctite® PL®
Premium®
3X Construction Adhesive Loctite® PL® Premium® 3X Construction Adhesive
  • Color
Complimenting Textured
Caulk Color Complimenting Textured Caulk
  • Hand Saw
with Finish
Blade Hand Saw with Finish Blade
  • Deck
Screws Deck Screws
  • Chalk Line /
Laser Chalk Line / Laser
  • Pencil Pencil
  • Safety
Glasses Safety Glasses
  • Square/Triangle Square/Triangle
  • Stud Finder Stud Finder
  • Tack Cloth Tack Cloth
  • Tape
Measure Tape Measure
  • Ladder Ladder
  • Touchup Kit Touchup Kit
  • Clean Cloth Clean Cloth
  • Small
Paint Brush Small Paint Brush
  • Painters
Tape Painters Tape
24 Hours Before Starting
Acclimate all beams by storing them flat in the installation location (but away from moisture and direct sunlight or other heat sources) for at least 24 hours.

Installation Overview
flush mount install materials


WARNINGS:
  • Be sure to obey all safety rules and recommendations set forth by tool manufacturers.
  • Wear safety glasses during the entire installation process.
  • Always comply with clearances set forth by the manufacturer of stoves, fireplaces, furnaces, and any other heat source.

WARNING: Our products may have screws embedded below the surface. We recommend using a hand saw (not power tools) when cutting these products. You may locate screws with a stud finder. Barron Designs is not responsible for any bodily harm or damage to your equipment.

WARNING: Beams are for decorative purposes only. They are not to be used for structural support, bracing or suspension of objects.
decorative only

Before You Start

  1. Ensure surface is structurally sound and in good condition. Surfaces such as drywall should be flat and smooth to minimize gaps.
  2. Gather all tools and materials.
  3. Inspect Beams:
    - If the beam(s) shipped in more than once piece, there will be markings inside the beams that indicate intended fit.
    - If the beam(s) have a lap or scarf joint, be sure to mount the top section first.

beam installation



Click Here for Care and Maintenance info.

Beams Installation

Lay Out the Installation

Step 1

Lay Out the Installation

Tools:

  • Painters Tape
  • Chalk Line/Laser
  • Tape Measure

Establish where to install the beam and mark guidelines using painters tape or a chalk line.

Locate and Mark Studs

Step 2

Locate and Mark Studs

Tools:

  • Pencil
  • Stud Finder
  1. Mark all studs using a stud finder and pencil.
  2. If studs do not align with the installation, plan to use toggle/lag bolts in Step 5 to attach mounting blocks.

Determine Number of Mounting Blocks

Step 3

Determine Number of Mounting Blocks

Tools:

  • Tape Measure
  1. A block at each end of the beam A
  2. At least every three feet along the beam. B
  3. If using more than (1) beam in a run, mounting blocks must be used at the joint where the beams meet. C

Measure and Cut Mounting Blocks

Step 4

Measure and Cut Mounting Blocks

Tools:

  • Square/Triangle
  • Lumber
  • Wood Cutting Saw
  • Drill Driver & Bits
  • Tape Measure
  1. Measure the inside dimensions of the beam and subtract 1/8 inch to determine the size of the mounting blocks.
  2. Cut the quantity of mounting blocks calculated in Step 3 and ensure both ends are perfectly square.
  3. Pre-drill a least (2) holes per block to make them easier to attach.

Attach Mounting Blocks to Ceiling

Step 5

Attach Mounting Blocks to Ceiling

Tools:

  • Drill Driver & Bits
  • Toggle/Lag Bolts
  • Painters Tape
  • Screws
  • Mounting Block
  1. Attach the first mounting block as close to the side wall as possible and in line with the guides from Step 1. The blocks on either end of the installation serve to minimize future gapping due to seasonal expansion and contraction.
  2. Secure additional mounting blocks approximately every 3 feet by screwing the blocks into studs or using toggle/ lag bolts. If joining more than (1) beam, ensure that there are mounting blocks at the point where the beams will meet and that the blocks project 2 to 3 inches on both sides of the joint.
  3. Remove painters tape guide lines (if used).
  4. Mark the location of the mounting blocks by placing painters tape on the ceiling about 1 1/2 inches from each side of the blocks. This is a reference point for Step 8.

Dry Fit

Step 6

Dry Fit

Tools:

  • Hand Saw with Finish Blade
  1. Check beam length by dry fitting in place.
  2. Tim/Miter beam if needed. It is best to cut the beam slightly long (by about 1/8") to ensure a tight fit.
WARNING: Our products may have screws embedded below the surface. We recommend using a hand saw (not power tools) when cutting these products. You may find these screws with a stud finder. Barron Designs is not responsible for any bodily harm or damage to your equipment.

Apply Adhesive

Step 7

Apply Adhesive

Tools:

  • Adhesive
  • Caulk Gun
  • Tack Cloth
  1. Wipe the edges of the mounting blocks and the inside of the beam with a tack cloth to remove debris.
  2. Apply adhesive to the edges of the mounting blocks that will contact the beam.

Install Beam

Step 8

Install Beam

Tools:

  • Clean Cloth
  • Screw Gun / Drill Driver & Bits
  • Screws
  1. Slide beam in place over the mounting blocks.
  2. Slightly countersink a minimum of (4) screws, ((2) per side), through the beam at each mounting block. If your beam has more than one section, be sure to secure each section with at least 4 screws (2 per side), penetrating the mounting block that straddles the sections.
  3. Remove painters tape.

Touch-Up

Step 9

Touch-Up

Tools:

  • Caulk
  • Caulk Gun
  • Touch-Up Kit
  • Small Paint Brush
  1. Apply color complimenting textured caulk to fill screw holes. Blend caulk into adjacent surfaces while it is still wet.
  2. Where necessary, apply caulk to joints and gaps.
  3. Use paint from the touch-up kit to paint over the caulk.